I have three 2-3/8 holes in the back of my aquarium. I bought it pre-drilled.would and 1-1/2.schedule 40 bulkhead size fit correct?and if i use 2 as sumps and one as return what gph flow rate would i need not usinging overflow boxes.in going to use 45 with strainer on top?