I am getting ready to fire the bullet on a topoff system from autotopoff.com.
I am planning on plumbing the system directly to my RO/DI system. My concern is I would like to build in some redundancy for safety reasons.
I was planning on purchasing a dual switch (one low leve/one high level) (for sump) as well as dual solenoids. My question is this, can the second high level switch be used with an solenoid? Is this step unnecessary with the use of dual solenoids?