Busy day again today. Got a few things done today even after squeezing in a Costco run, new tires for the truck, a smog test, and a trip to the hardware store. Got my mount for my lights framed up and water sealed, just need to mount on the LEDs and hang from the ceiling. Added top layer of 3/4" sanded maple plywood, drilled holes for the new tank, and got that water sealed too. Hopefully tomorrow I get some time to move a few things out of the room, test the sump for flow again, and finish painting the bottom of the tank. Also, my black egg crate diffuser arrived yesterday with a couple broken pieces (not unusable) and the good people where I ordered it from said they will ship me replacements Monday. Hoping I get enough done so next weekend I can install the three tanks and get them plumbed in. Oh I forgot I still need to drill the 55 gal. One more thing lol!