So the only news I have on this stalled and highly anticipated build is that I plan on getting my sand tomorrow. The only home depot that has pool filter sand is like an hour away so I will stop in and see if they have any left. And tomorrows Friday so it's fish/gear shopping day for me. Who knows what I may end up with. lol
Also gonna measure the sump and check out the stand I'll be buying again, just wanna make sure it will fit with some room to spare. I probably won't go with an ATO on this tank as it will be covered so I'm hoping evaporation will be minimal.
I may put a deposit on the stand just to hold it if he'll let me, I hope to be able to pick it up by next weekend. Just gotta get paid on wednesday and find someone with a truck to haul it for me.
I figure once I have it in the garage I can do the stuff that needs to be done. Like painting the back glass, maybe start the plumbing work, and getting a general feel for this new type of setup. Never went predrilled OR wet/dry before. lol
I think i asked earlier, but I need a ball valve on the overflow line into the sump correct? I plan on adding one to the return pump already, just trying to figure out what I'm gonna need to plumb this bad boy.
I think I'm gonna stick to hoses for now, not sure what all is involved with going PVC.
Is there any benefit to going with all PVC lines? The line going to the sump is gonna be like 1 foot so I'm not sure how to make that work with PVC.
let me know what you all think! and give a little prayer that my 55g sells soon if you would, getting inpatient more each day.